Need script for recent topics
3 posters
Page 1 of 1
Need script for recent topics
Hi!
Give me, please, script (may be javascript?) for move these - in one line. Only this. Thanks
Give me, please, script (may be javascript?) for move these - in one line. Only this. Thanks
Re: Need script for recent topics
All what you need is in widgets make bigger width. By defaut it is 180px and if you make it bigger text will fill it and go to one line.
But it will take a lot of place of your forum.
But it will take a lot of place of your forum.
Re: Need script for recent topics
It's not work. <br> automatic insert between topic-name and time created. I do 500 px of this widget width, but no effect.
Wishout <br> main page nicely appearance:
(added forum in every line, in [])
Wishout <br> main page nicely appearance:
(added forum in every line, in [])
Re: Need script for recent topics
{display:inline;} - how this to insert? I do not know element to it.
Re: Need script for recent topics
Hi
Is this your forum? http://stihi-poesia.forumsclub.com/
Can you please link us to your forum and then reset it to the way it was before if you used a code?
Regards,
Pizza Boi
Is this your forum? http://stihi-poesia.forumsclub.com/
Can you please link us to your forum and then reset it to the way it was before if you used a code?
Regards,
Pizza Boi
Pizza Boi- Hyperactive
- Posts : 2016
Reputation : 160
Language : French
Location : Pizza Hut!
Re: Need script for recent topics
Hi
Okay, so technically speaking, both portions have to adapt to each, correct? As far as I'm concerned, each board is allowed up to 255 characters but let's not put that much adaption to them.
Apply this in your stylesheet:
Unfortunately, every time it exceeds, you have to adjust the values presented in the #ipbwrapper and #content-container div#left.
Don't worry, I managed to re-bunk the Forum Width Adjuster and it should now be adaptable to Invision.
Copy paste the code below into a custom table widget:
Note: That can be used to auto re-size your whole forum's width, excluding the widget since that should be done manually via CSS. For this to work, you must have all #ipbwrapper { width: #; } removed in your CSS.
Regards,
Pizza Boi
Okay, so technically speaking, both portions have to adapt to each, correct? As far as I'm concerned, each board is allowed up to 255 characters but let's not put that much adaption to them.
Apply this in your stylesheet:
- Code:
#content-container div#left {
width: 350px !important;
}
#ipbwrapper {
width: 180%;
}
Unfortunately, every time it exceeds, you have to adjust the values presented in the #ipbwrapper and #content-container div#left.
Don't worry, I managed to re-bunk the Forum Width Adjuster and it should now be adaptable to Invision.
Copy paste the code below into a custom table widget:
- Code:
/--- Pizza Boi's tutoriel pour codes-ciel ---/
/--- Ce code peut être autorisé à être reproduit avec le consentement de Pizza Boi ---/
/--- Si ce code a déjà été faite, il s'agit d'une version différente ---/
/--- Copyright @ Pizza Boi 2014 ---/
<script type="text/javascript">
jQuery(document).ready(function(){
jQuery("#pizzawidth").click(function(){
var a=Number(document.getElementById("muchsalt").value);
var b=0;
jQuery("#ipbwrapper").animate({width:a},1100, "linear");
if(a==1200){b=1;}
if(a==1300){b=2;}
if(a==1350){b=3;}
if(a==1400){b=4;}
if(a==1500){b=5;}
if(a==1600){b=6;}
if(a==1700){b=7;}
});
});
</script>
<center><div style="text-align: center;"><input type="submit" value="Set" id="pizzawidth" /><select id="muchsalt">
<option selected="selected">1200</option>
<option>1300</option>
<option>1350</option>
<option>1400</option>
<option>1500</option>
<option>1600</option>
<option>1700</option>
</select></div></center>
Note: That can be used to auto re-size your whole forum's width, excluding the widget since that should be done manually via CSS. For this to work, you must have all #ipbwrapper { width: #; } removed in your CSS.
Regards,
Pizza Boi
Pizza Boi- Hyperactive
- Posts : 2016
Reputation : 160
Language : French
Location : Pizza Hut!
Re: Need script for recent topics
this is not what I need.
<br> fact still remained?
I know that there are good programmers, and therefore addressed
<br> fact still remained?
I know that there are good programmers, and therefore addressed
Similar topics
» Recent Topics HTML script
» Selecting Topics to include in Recent topics scroll
» Exclude recent posts from specific forum(s) from last/recent topics widget?
» Change Recent Topics widget to Recent Posts?
» Quirks with Prosilver green skin? Recent topics stalling , duplicating topics, or blank?
» Selecting Topics to include in Recent topics scroll
» Exclude recent posts from specific forum(s) from last/recent topics widget?
» Change Recent Topics widget to Recent Posts?
» Quirks with Prosilver green skin? Recent topics stalling , duplicating topics, or blank?
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum